DualLite LSN Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Adaptateurs et onduleurs de puissance DualLite LSN. DualLite LSN User manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - User Manual

Installation InstructionsandUser ManualForInverter Power Systems 1.0 - 17.5 KVA

Page 2 - IMPORTANT SAFETY INSTRUCTIONS

10105. Battery Installation and ConnectionInstalling the Batteries and DC WiringImportant Safety PrecautionsTheinstallermusttaketheseprecautions

Page 3 - Table of Contents

11105.1 ToolsThefollowingtoolsarerequiredtoinstallthesystembatteries.Othertoolsmaybenecessaryifoptionalbatterieshavebeen ordered.C

Page 4 - 101Specications

12Installing BatteriesNOTE: ThefollowingprocedureappliestostandardType“S”maintenance-freeLead-Calciumbatteries.LSNsystemsspeciedwith

Page 5 - 102.1 Shipping Damage

13Fig. 1BATTERY WIRING DIAGRAM8 BATTERY SYSTEMSCAUTION: Orient all batteries with the positive terminals to the right as shown in the diagram above.

Page 6 - CAUTION

14CAUTION: Orient all batteries with the positive terminals to the right as shown in the diagram above. Carefully observe battery polarity when maki

Page 7 - 104. Cabinet Mounting

15CAUTION: Orient all batteries with the positive terminals to the right as shown in the diagram above. Carefully observe battery polarity when maki

Page 8 - 104.3 Cabinet Installation

161300736 Rev E Fig. 4BATTERY WIRING DIAGRAM36 BATTERY SYSTEMSCAUTION: Orient all batteries with the positive terminals to the right as shown in the

Page 9

17105.4 Battery Cabinet Voltage Check and DC Fuse InstallationNote:Thisprocedureappliestoa36batterysystem.Fewerstepsmayberequiredde

Page 10 - Important Safety Precautions

18106. AC ConnectionsCAUTIONA. AllLSNinvertersystemunitscontainhazardousACandDCvoltages.Becauseofthesevoltages,aqualiedelectrician

Page 11 - 105.1 Tools

195. Ifnotpreviouslydone,removeknockoutsforACInputandACOutputinthetopoftheLSNinvertersystem(SeeFigure1inSection104.1). CAU

Page 12 - Installing Batteries

2READ AND FOLLOW ALL SAFETY INSTRUCTIONSIMPORTANT SAFEGUARDSWhen using electrical equipment, you should always follow basic safety precautions, includ

Page 13 - CAUTION:

20107. RS232 ConnectionsAll LSN inverter systems are supplied with an RS232 communications port. This port may be used for remote monitoring and con

Page 14

21!109. Maintenance Bypass Switch Phase Check If you are not using a bypass switch with the LSN inverter system, the phase check is not necessary, s

Page 15

22 CAUTION: If a Make Before-Break type bypass switch is being used, equipment will be damaged if the switch position is changed while AC line vol

Page 16 - 1300736 Rev E

23Section 200 User Manual201. User Interface Panel BasicsLED Status IndicatorsAC-On - AC is present at output terminalsReady - Unit is ready for eme

Page 17

24201.1 Using The Interface PanelThe User Interface Panel is used to display over 250 system parameters, operating modes, alarms and stored logs. Wh

Page 18 - 106. AC Connections

25User Keypad Actions Display Readout[PRG] EnterControlCode Setup Value0 Enter Control Code Setup Value 0 [ENT] PasswordRequired Please e

Page 19 - CAUTION:

26201.6 Parameter“HotKey”ListingByFunctionUser changeable parameters are shown in boldface.Metered Parameters: Time & Date (0,10)Inp

Page 20 - 107. RS232 Connections

27201.6 Parameter“HotKey”ListingByFunctionUser changeable parameters are shown in boldface.Monthly, Yearly Test & Equalize Time Setup:Time

Page 21

28202. System Self-DiagnosticsSelf-testing/self-diagnosticelectronicsperformcontinuoustestingofsubsystems,insuringperformancetoprescribedo

Page 22 - 111. SystemVerication

29203.5 Performing a Manual TestManual5-minutetestsmaybeperformedatanytimeusingthefollowingprocedure:1 Press[PRG],182,[ENT].2. Displ

Page 23 - Section 200 User Manual

3Table of ContentsSection 100 System Installation InstructionsDescription Page101. UnitSpecications ...

Page 24

30Battery Voltage Log (Hot Key # 155)An hourly log of the systems total battery voltage and the charging current. Retains the last 48 entries.081200

Page 25

31205. Alarms What They Mean And How To RespondWhentheLSNsystemdetectsaproblem,it:• Sounds an alarm• Illuminates the red "ALARM" L

Page 26

32Alarm Message What it means What to doALM VA Hi 16218 15000 Unit has detected an Remove some of the load until alarm clears. overload and is ab

Page 27 - Miscellaneous:

33206. CommunicationsEachLSNsystemissuppliedwithaDB-9/RS232communicationportenablingtheusertocommunicatewiththeequipmentfromaremo

Page 28 - 203. System Auto Testing

34Thee-maildeviceautomaticallysendsane-mailtotheaddressesprogrammedwhenever: •Theunitperformsaweekly,monthlyorannualsystemtest

Page 29 - Inverter Log (Hot Key # 24)

35300. Maintenance300.1 Safe Shut Down ProcedureCAUTIONToavoidpossibleequipmentdamageorpersonalinjury,assumethatthereisACvoltagepresen

Page 30

36300.2 Routine System Maintenance TheLSNinvertersystemunitisdesignedtoprovideyearsoftrouble-freeoperation.Itsself-testing/self-diagno

Page 31 - 205. Alarms

37300.4 Battery Maintenance and ReplacementThissectionprovidesprecautionsforqualiedservicepersonnelworkingwithunitbatteries.Nouserser

Page 32

38CAUTION:A battery can present a risk of electrical shock and high short circuit current. Battery replacement should only beperformedbyqualied

Page 33 - 206. Communications

395. Remove the batteries from the cabinet. Batteries can be very heavy, use proper lifting methods when removing battery.6. Install new batteries f

Page 34 - 208. Service Options

4Section 100 System Installation Instructions101SpecicationsInput• Inputvoltage:120,208,240,277or347VAC+10-15%.Othervoltagesavailableo

Page 35 - 300. Maintenance

40 Param. Keyboard Password No. Type Alpha Level Description 0 Both t User Time  1 Dsp vi N/A InputVoltage 2 Dsp vo N/A O

Page 36 - 300.3 Changing Air Filters

41 Param. Keyboard Password No. Type Alpha Level Description 168 Both hvoe Serv E/DHiOutputVoltsAlarm  169 Both hvie Serv E/D

Page 37

42Notes: 268 Both gwa User Gatewayaddress 269 Both snm User Subnet mask 270 Disp em1 N/A E-mailaddress1 271 Both em2 User E-mai

Page 39 - WARRANTY

44A Hubbell Lighting, Inc. brand with representatives' offices in principal cities throughout North America. Copyright © Hubbell Lighting, Inc.

Page 40 - Appendix 1

5102. Receiving, Moving and Storing Systems and Batteries 102.1 Shipping DamageLSN inverter systems and batteries are normally shipped separately.Ca

Page 41

6103. Installation Requirements103.1 Operating EnvironmentInstalltheLSNinvertersysteminaclean,cool,dryplacewithnormalventilationforhu

Page 42

7104. Cabinet Mounting104.1 DimensionsTable 104A - Dimensions: Unit and Battery Cabinets Width (A) Height (B) Depth (C) Footprint 30 in. 46 in.

Page 43

8Fig. 1 Fig. 2Fig. 3 Fig. 4104.3 Cabinet InstallationBasedonthedesiredcabinetcongurationfortheapplication,removetheappropriateknockouts

Page 44 - 0601681 J 10/09

9Install Wall Mounting Brackets To Top Cabinet On Both Sides Conguration“A”TwoCabinet SystemsInstall Wall Mounting Brackets To Top Cabinet On Both S